22 Ramsey 31 March 2026

The conductor of Manx Electric Railway car 22 prepares to reverse the trolley pole at Ramsey on 31 March 2026, as the tram arrives at the terminus with the 09:40 Douglas to Ramsey service. The overhead wire is energised at 550v DC.