60062 Wickwar Tunnel 2 September 2020

60062 Stainless Pioneer approaches Wickwar Tunnel on 2 September 2020 with the 6B41 11:19 Westerleigh to Robeston empty oil tanks. You have to question the logic of Network Rail's lineside clearance policy, as although most of the vegetation has recently been cut back here, the largest tree has been left untouched. It hasn't even been trimmed, and the branches are still almost touching passing trains.