70807 Culham 25 September 2025

Six wagons of rails, and a single ballast wagon is the miniscule load for 70807, as it heads south at Culham on 26 September 2025 with the 6O24 09:25 Hinksey to Eastleigh East Yard engineer's working. The train is passing the site of a former public footpath crossing. This has quite rightly been closed, as the curving track severely restricted visibility, and in any case there is a much easier crossing over the bridge from which this picture was taken.