Bank Top (Swinefleet Peat Railway) 1 September 2002

The junction at Bank Top on the Swinefleet Peat Railway, where the line to the peat workings on Goole Moor diverged from the 'main line'. This picture was taken on 1 September 2002, shortly after the whole system had closed. The line follows the edge of the gravel road before turning through ninety degrees in the distance, and then heading towards the peat works. The line carrying straight on in the foreground passed the refueling depot and headed out to more peat diggings alongside the Backwater Dyke.