Hunting Butts 14 October 1979

The Cheltenham to Stratford-upon-Avon railway was closed as a through route in 1976, and has subsequently been partially reopened by the Gloucestershire Warwickshire Railway, starting from their base at Toddington. Unfortunately the society was formed after the track had been lifted and consequently many hours of manpower have gone into reinstating the track in various stages. One section that is unlikely to be reinstated is the portion between Cheltenham and Cheltenham Racecourse. A severe ballast washout is pictured here just to the south of Hunting Butts Tunnel on 14 October 1979.

Hunting Butts Tunnel 14 October 1979

The south portal of Hunting Butts Tunnel, on the disused Cheltenham to Stratford-upon-Avon route is pictured on 14 October 1979, just a few weeks before the track was lifted. The extremley rusty condition of the rails indicates that no train has passed this spot for over three years. After track lifting the tunnel acquired the inevitable steel fence barring all access.

Gotherington 7 October 1978

Two years after the line closed as a through route, the Cheltenham to Stratford-upon-Avon line is pictured at Gotherington on 7 October 1978. When I revisited this spot almost exactly a year later the track had just been lifted. Now, of course, the Gloucestershire Warwickshire Railway have reinstated this section of line. Just out of sight around the corner is the Dixton road overbridge, while a short distance behind where I am standing is the now reopened Gotherington Halt.

Prescott 7 October 1978

The disused Cheltenham to Stratford-upon-Avon route is pictured here near Prescott on 7 October 1978, looking towards Winchcombe. The line had closed two years previously, but the track was left in situ until 1979. This section of line has now been reinstated by the Gloucestershire Warwickshire Railway, albeit with only a single track.

Winchcombe 14 October 1979

The end of the line at Winchcombe on 14 October 1979. Huge piles of reclaimed track sections dominate this view, as track lifting operations are under way to dismantle the former Cheltenham to Stratford-upon-Avon route, which closed three years previously. Although the flat bottom rail sections are being saved complete, the bullhead rail sections were being removed piecemeal, with a crane lifting out the rails and the sleepers then being dug out of the ballast individually. Note that the keys have already been knocked out of the chairs of the line on the right in the foreground. Winchcombe Goods Shed (now the Gloucestershire Warwickshire Railway's carriage department) can be seen in the background, with the demolition contractor's vehicles just in front.

Toddington 14 October 1979

A scene of dereliction at Toddington on 14 October 1979, and a vast difference to the busy scene today. This is the far end of the yard at Toddington station, at what would later become the headquarters of the Gloucestershire Warwickshire Railway. The top of a signal post gives a good view of the line heading off towards Hailes. The weed grown track is only a few weeks away from being lifted. The overgrown area near the field boundary on the right is now the course of the North Gloucestershire Narrow Gauge Railway.

Toddington 14 October 1979

Toddington station in limbo on 14 October 1979, three years after the line was closed and just a few weeks before the track was lifted. Of course this location looks very different now, as it is the thriving hub of the Gloucestershire Warwickshire Railway, who took over the site in 1981. Happily all the GWR brick built buildings seen here survived. The station had closed in 1960 and the once extensive sidings lifted, leaving just the one visible on the left for use by engineers trains.

Toddington 14 October 1979

Looking towards Stanway Viaduct from just north of Toddington station on 14 October 1979. Tracklifting is about to take place, and indeed the rails on the up line have already been removed prior to lifting out the sleepers. The Gloucestershire Warwickshire Railway has since relaid this section of the route.

Broadway Goods Shed 14 October 1979

Broadway Goods Shed pictured on 14 October 1979. The Cheltenham to Stratford-upon-Avon line closed in 1976, and I just managed to arrive in time to photograph the track before lifting, although not before the rails on the up line had been removed from their fastenings, as seen here in the foreground. The GWR built shed survives, although the corrugated iron extension on the right has since been removed.

Broadway 14 October 1979

The site of Broadway station, on the disused Cheltenham to Stratford-upon-Avon line, pictured looking towards Willersey on 14 October 1979. The platforms were situated just beyond the road underbridge, underneath the Scots Pine trees (an obvious giveaway for a GWR station site!). The goods yard was situated behind me to the right. The line closed in 1976 and tracklifting was in progress when I visited three years later, as can be seen by the lifted rails on the up line. Note the piles of fishplates and track keys on the down line.

Honeybourne West Loop Junction 14 October 1979

Honeybourne West Loop Junction, on the disused Cheltenham to Stratford-upon-Avon line, pictured on 14 October 1979. This view is looking towards Weston-sub-Edge, and shows the 1960 built signal box, with sidings just visible behind. This route closed in 1976, and tracklifting was in progress a little further south, but hadn't quite reached this far yet, so for the moment nature is getting the upper hand!

Honeybourne West Junction 14 October 1979

Honeybourne West Loop Junction, looking towards Stratford-upon-Avon on 14 October 1979. The actual junction is just in front of the bridge in the background, which carries the Worcester to Oxford 'Cotswold Line' over the route. After over three years out of use, all trackwork and structures are still in place. Surprisingly all the semaphore signals are also still in situ. At least some of these collectors items would probably go missing nowadays! Incidentally, the missing distant arm on the right hand bracket had already been removed (presumably officially!) by the mid 1970s.

Long Marston Station 31 August 1981

Long Marston station viewed from the top of the down home signal on 31 August 1981. The station, which can be seen beyond the crossing gates closed in 1966, but the line from Honeybourne was retained for the as required movements into the nearby army base (behind the bushes on the left). I'm not too sure whether this picture truly deserves to be included in a 'Disused Railways' section, as the slight sheen on the down line gives a clue that the line has been used fairly recently. Incoming trains had to reverse into the yard, and consequently a new direct connection was added near the bridge in the background. This came into use 16 November 1981. However, as can be seen by the invading brambles on the track, the up line has been out of use for years.

Steeple Claydon 27 March 2012

The section of the former Oxford to Cambridge line between Claydon Junction and Bletchley last saw a train in 1993. Since then nature has been allowed to take over, with some sections getting very overgrown. One of the clearer sections in shown here on 27 March 2012. This is looking west, back towards Claydon Junction, from a point just south of the village of Steeple Claydon. The board warned drivers of the approach to Steeple Claydon Level Crossing

Steeple Claydon Level Crossing 27 March 2012

The remains of Steeple Claydon Level Crossing pictured on 27 March 2012. Despite appearances, the rails are still present on the other side of the fence, but young ash trees are finding the ballast no hindrance to growth. The last train crossed this road nineteen years previously.

Claydon Station 27 March 2012

Claydon Station was situated between the villages of Steeple Claydon and Middle Claydon, and was opened by the Buckinghamshire Railway in 1850. It closed, along with neighbouring stations on the Oxford to Bletchley line, in 1968, although the line remained open for freight until 1993. The remains of the platform are seen here on 27 March 2012.

Verney Junction 27 March 2012

The rusting track of the closed Oxford to Bletchley line is pictured here on 27 March 2012. This view is looking west from near the site of Verney Junction, near the point where the line to Buckingham diverged off to the north.

Verney Junction 27 March 2012

Verney Junction reverts to nature, with sizeable ash trees growing between the rails. This view, taken on 27 March 2012, shows that both platforms are intact, although apart from the station master's house, no buildings remain. Will trains ever pass this way again? There are plans to reopen the line, although it is doubtful whether such a remote station will see further use.

Winslow 27 March 2012

The disused Oxford to Bletchley line at Winslow, pictured on the unseasonably warm 27 March 2012. This is one of the more vegetation free sections of the Claydon to Swanbourne stretch, which last saw a train in 1993. From Swanbourne onwards the track has been lifted. This is looking towards Swanbourne.

Swanbourne Station 27 March 2012

Despite having closed as long ago as 1968, Swanbourne station looks remarkably tidy in this view, taken on 27 March 2012, thanks presumably to the residents of the station house. The platforms now boast a lush soft springy grass surface, but no passengers loiter and no trains run!

Swanbourne 27 March 2012

The last few yards of extant track at Swanbourne, on the former Oxford to Bletchley line, pictured on 27 March 2012. Swanbourne Station is just behind me, while just on the other side of the bridge, the track towards Bletchley has been lifted.

Swanbourne Bridge 27 March 2012

Despite appearances, there really still is a line of rails passing underneath this bridge! Just to the east of Swanbourne station the Mursley to Little Horwood road crosses the Oxford to Bletchley line via this weather beaten brick bridge. Pictured on 27 March 2012, this is looking north east, towards Newton Longville.

Swanbourne End Of The Line 27 March 2012

The end of the line at Swanbourne on 27 March 2012. Looking towards Newton Longville and Bletchley, this view shows the last few yards of remaining track on the section of the disused line from Claydon Junction. If local plans come to fruition, this could once again become part of a cross country passenger route.

Marton Junction 2 June 1984

A super abundance of hawthorn blossom at Marton Junction on 2 June 1984. This view looking east from the impressively high Honingham Hill Road Bridge shows the Junction where the line to Southam Cement Works diverged from the Rugby line. The line can be seen heading for several miles in an almost dead straight line towards Rugby. Although not actually officially closed when this picture was taken, all traffic had effectively stopped and the rails were completely rusty. Bizarrely the weedkilling train traversed the entire route in 1985.

Marton Junction 2 June 1984

Marton Junction pictured on 2 June 1984 with the Honingham Hill Road Bridge spanning the actual junction. The line to Southam Cement Works can be seen diverging to the right, while straight on leads to Rugby. Incoming trains would have to run round using the loop in the foreground. Although not officially closed at this time, the state of the track indicated it was a long time since a train had passed this way.

Marton Junction 2 June 1984

Snowford Farm watches over the rusting remains of the Southam Cement Works Branch on 2 June 1984. This view is just a short distance from Marton Junction, where the branch curves through almost 90 degrees away from the line from Rugby. This was once part of the LNWR's through route from Warwick to Bletchley via Daventry. Cement traffic had virtually finished by this time and apart from the extraordinary time and money wasting visit of the weedkilling train the following year, saw no further traffic until the line was lifted in the 1990s. 

Swindon Evelyn Street 22 August 1978

When the Midland & South Western Junction Railway closed as a through route in 1961, a short section survived at Swindon, both north and south of the junction with the Great Western Mainline at Rushey Platt. The southern section to Swindon Town station was lately used as a roadstone base for the construction of the nearby M4 motorway in the early 1970s. The end of the line was just short of the bridge over Evelyn Street and is shown here on 22 August 1978. No buffer stop of any kind was provided! The track was lifted shortly after this picture was taken, and although the bridge whose parapets can be seen still survives, it would be impossible to take this picture today, as you would be inside somebody's front room in one of the newly built house on the site!

Swindon Town Station 22 August 1978

The remains of Swindon Town station pictured on 22 August 1978 in a brief burst of weak sunshine on an otherwise dull day. It had last seen trains several years before when numerous stone trains worked from the Westbury area to help with the construction of the M4 motorway. This whole site has now completely disappeared under a new industrial estate. However, the former MSWJR offices (the brick built building seen through the gap in the trees) still survives.

Swindon Town Station 22 August 1978

The remains of Swindon Town station looking west on 22 August 1978, with some of the platform coping stones allegedly removed as they were fouling the wagons used on the stone trains in the early 1970s. Vegetation is taking over, but the scene would shortly be transformed, with the track being lifted and an industrial estate built on the site. The bridge does still survive as it marks the start of a cycleway which follows the course of the line around the southern edge of Swindon.

Swindon Wilts & Berks Canal Bridge 22 August 1978

The former Midland & South Western Junction line is pictured on a gloomy 22 August 1978 just to the south of Swindon where the course of the line crosses the Wilts & Berks Canal on a skew bridge. The track was lifted just weeks after this picture was taken. Surprisingly given the proximity to the ever expanding town of Swindon, this view has only changed a little. More houses have now been built in the field on the right, but the land to the left is still rural. The course of the line is now a cycle track.

Rushey Platt Bridge 22 August 1978

The former Midland & South Western Junction line crossed the Great Western Mainline at Rushey Platt via this girder bridge. It is pictured here looking north on 22 August 1978, shortly before it was removed. Although presumably the steelwork was sound, there were numerous missing planks, through which HSTs could be seen speeding by!

Moredon Power Station 22 August 1978

In addition to the short section of line leading south from Swindon to Swindon Town, another length of the former MSWJR was retained after the through route closed in 1961, this time northwards to serve Moredon Power Station. The power station was opened in 1929 and continued taking in coal deliveries by rail for the next forty years. It finally closed in 1973 and was demolished in 1979 to make way for the inevitable housing estate. The trackwork is getting rapidly overgrown in this 22 August 1978 view, with Moredon's solitary cooling tower in the background. Within a few months the scene would be changed totally, with the track lifted and the power station gone.

Moredon 22 August 1978

Looking north along the last few yards of the extant former Midland & South Western Junction Railway at Moredon, near Swindon, on 22 August 1978. This section of line was retained for the benefit of the nearby Moredon Power Station. The track was lifted shortly after this picture was taken, but surprisingly this farm occupation bridge still survives. However, instead it of it being in a rural location, as when photographed here, it is now next to the busy Thamesdown Drive, which is effectively a ring road for the western expansion of Swindon.

Moredon End of the Line 22 August 1978

During the 1970s a short length of the former Midland & South Western Junction Railway was retained from the Great Western Mainline at Swindon as far north as Moredon Power Station. The line extended for approximately ½ mile beyond the power station in what was presumably intended as a very long headshunt. I assume no trains ever ventured up this far, and consequently there was no need to provide a buffer stop! The very end of the line is just about visible in the undergrowth in this 22 August 1978 view. The track was lifted a few months later. Note the very characteristic feature of many landscape pictures taken in the 1970s - the row of dead elm trees on the horizon, recently killed by Dutch elm disease.

Tidenham 17 March 2007

Although it closed as a through route in 1964, the southern end of the Wye Valley line remained open for freight until 1990. Initially stone trains from Tidenham Quarry kept the line busy, but these ceased in 1981 and the line was cut back to Dayhouse Quarry. This traffic finally came to and end in March 1990, and the junction with the main line (appropriately named Wye Valley Junction) was removed. The rusting line is pictured on 17 March 2007, just at the point were it curves away from the main line, which is already at a much lower level, looking towards Tidenham.

Tidenham 18 August 1984

It has been several years since the last train passed this way, as vegetation begins to encroach on the track at Tidenham on 18 August 1984. The Great Western Railway's Wye Valley route closed in 1964 with the exception of the southernmost section to Tidenham Quarry. Hidden in the bushes in the background is the bridge that carries the minor road from Tidenham to Lancaut over the line, and just a few yards beyond that is the entrance to Tidenham Tunnel.

Tidenham Tunnel 18 August 1984

The southern portal of Tidenham Tunnel pictured on 18 August 1984, just a few years after the line closed, and long before the surrounding vegetation virtually completely obscured the view. Also, since this picture was taken, the inevitable fence has been erected to prevent unautorised access.

Bank Top (Swinefleet Peat Railway) 1 September 2002

Track reclamation underway at Bank Top on the Swinefleet Peat Railway on 1 September 2002. The 3 ft gauge line had closed earlier that year, and although the trackwork was still largely intact when I visited, a start has obviously be made to recover the materials. Bank Top was the main depot, midway between the peat works (which had good road access) and the peat workings out on the moors. The remains of the refueling depot can be seen on the left in this view, amongst which Motor Rail 0-4-0 diesel 40s302 was dumped. The still intact 'main line' is virtually hidden in the gravel, but runs along the right hand side of the roadway here, with the junction for the line leading across Goole Moors by the gap in the machinery.

Top Bank (Swinefleet Peat Railway) 1 September 2002

The junction at Bank Top on the Swinefleet Peat Railway, where the line to the peat workings on Goole Moor diverged from the 'main line'. This picture was taken on 1 September 2002, shortly after the whole system had closed. The line follows the edge of the gravel road before turning through ninety degrees in the distance, and then heading towards the peat works. The line carrying straight on in the foreground passed the refueling depot and headed out to more peat diggings alongside the Backwater Dyke.

Bank Top (Swinefleet Peat Railway) 1 September 2002

How about this for some seriously dodgy tracklaying! It is not surprising that the Swinefleet Peat Railway suffered from numerous derailments when the switchback nature of the track is taken into account. This picture, taken on 1 September 2002, shows the line heading across Goole Moors from the main depot at Bank Top. Peat has been extracted from either side of the line, leaving it on an embankment. Nature is already reclaiming the area in the background, and the whole area is now a nature reserve, with all traces of the 3 ft gauge railway removed.

Bank Top (Swinefeet Peat Railway) 1 September 2002

The rusting rails of the disused 3 ft gauge Swinefleet Peat Railway stretch out across Goole Moors on 1 September 2002, with the gravel ballast contrasting sharply with the black peat diggings on either side of the line. The peat extraction has left the railway on a substantial embankment at this point. Eggborough Power Station can just be seen on the horizon at the far end of the line, while the chimney of Drax Power Station peers out from behind the bushes on the extreme right of the picture.

Bank Top (Swinefleet Peat Railway) 1 September 2002

The southern end of the 3 ft gauge Swinefleet Peat Railway, pictured on 1 September 2002. The line coming in from the right leads to Bank Top depot and ultimately the peat works. After traveling for some distance alongside the gravel road, it traverses this ninety degree bend to head off alongside the Backwater Dyke to an area of peat diggings known locally as the Shoulder of Mutton. The entire system closed in April 2002 and all trackwork has now been lifted.